RDEP · Research Driven Epistemic Path
A basis for understanding.

The problem
In a matter of seconds, a language model can produce text that is detailed, coherent and persuasive. That text can look like solid evidence. Fluency alone does not make it evidence.
What looks like analysis may be an assumption. What reads like a conclusion may be a guess. What is presented as fact may be a reconstruction from memory. When these blend into a fluent passage, a human reader—even a careful one, at times—can lose the ability to distinguish assumptions, guesses and facts.
The more costly and irreversible the decision, the greater the cost of this mistake.
Some projects begin with boundaries that are not yet understood. Even knowledgeable participants may discover important questions they did not know to ask.
What RDEP does
RDEP governs how research and engineering work moves from an uncertain idea to a justified decision and authorized action. It connects problem definition, investigation and testing with feasibility, requirements, architecture and human decisions. Its focus is the adequacy of the knowledge, evidence and reasoning behind that progression. That assessment also asks whether the work can be carried out with the available time and resources, which outcomes are actually required, and what could go wrong. A technically attractive idea still needs a realistic basis before people commit to it.
RDEP is designed to reduce uncertainty before commitment. That sounds simple. It is not, because the pressure is always in the opposite direction: start now; we will figure it out later.
To do this, RDEP requires the different bases of understanding and decision-making to remain distinct and not be used interchangeably as work proceeds. Evidence remains separate from assumptions. An observation remains separate from its interpretation. A proposal remains separate from a decision. And what we do not know is recorded as unknown, rather than filled in with a plausible sentence.
RDEP requires the basis of important conclusions and decisions to be recorded, so that “Where did this come from?” can be answered from the available sources. If that basis is missing, the gap must remain explicit.
From inquiry to governed implementation.
Nine Gates establish the basis for commitment. After the engineering transition, an implementation profile can carry that discipline into the work itself.
Frame the inquiry
- Gate 0Project charterWhat is this project for, what is its scope, and who has decision authority?
- Gate 1Idea definitionWhat is the idea, what does it assume, and what remains unknown?
- Gate 2State of the artWhat is already known, what evidence supports it, and what gap remains?
Establish the basis
- Gate 3FeasibilityWhat supports feasibility, and which critical uncertainties remain?
- Gate 4Research decompositionWhat research is needed, and which question does each task address?
- Gate 5RequirementsWhat must the system achieve, why, and how will it be verified?
Prepare the commitment
- Gate 6ArchitectureWhich design option is justified by the requirements, evidence and risks?
- Gate 7RFP readinessIs the work defined clearly enough to request and assess credible proposals?
- Gate 8Proposal evaluationWhich proposal, if any, is supported by credible technical and commercial grounds?
When an AI answer changes the direction of a project.
An illustrative scenario with invented test results. It is not a Memtric project record or a demonstration of an operational RDES product.
This example shows how RDEP’s research requirements can guide the work of humans and agents. It does not show that RDEP automatically detects errors or guarantees a correct outcome.
The idea
A team wants to detect equipment faults from sound, using ordinary microphones. The attraction is clear: identify problems without installing additional sensors inside every machine.
But the team does not yet know whether sound can reliably distinguish a developing fault from changes in workload, microphone position or background noise.
The tempting answer
An AI agent proposes:
“Record normal operation, train a model to detect unusual sounds, and use those deviations to identify faults.”
The proposal sounds practical. But it contains a step that still needs support:
An unusual sound does not, by itself, establish a fault.
Normal changes may sound unusual. A fault may also produce a signal that an ordinary microphone cannot distinguish under working conditions.
Turn the assumption into a research question
Before choosing a model or committing to the product design, the team needs to ask:
Can the proposed measurements distinguish a fault from normal variation under the conditions that matter?
That question changes the work. The next task is to examine relevant research and investigate what the measurements can establish—not simply to start training a model.
Design a check that could change the plan
An initial investigation could compare recordings from independently confirmed machine conditions, including healthy operation under different loads and relevant fault conditions.
The comparison would also need to account for microphone position and background noise. Otherwise, a system might appear to detect faults while responding to differences in how the recordings were made.
The method, access to equipment and acceptable test conditions would need to be defined before carrying out the investigation.
This outline is not a validated acoustic test protocol. A complete investigation would still need defined variables, measurement criteria, a falsification condition and test boundaries, with appropriate technical review.
Suppose the check reveals a problem
For this teaching example, imagine the following result:
Changes in normal workload produce stronger differences in the recordings than the selected fault does. A method that appeared promising under one fixed condition does not reliably separate those cases in the broader comparison.
This would not establish that acoustic fault detection is impossible. It would show that the current proposal does not yet have an adequate basis for the intended use.
The finding changes the available choices
The team now has concrete alternatives to investigate:
- Narrow the intended use to a defined machine and operating condition.
- Examine whether additional measurements could resolve the ambiguity.
- Reconsider whether the approach is worth pursuing under the project’s constraints.
The accountable human can then decide which further work to authorize, using the findings, remaining uncertainties and consequences of each option.
Choosing an option does not establish that it will work. It defines the next investigation and the commitment being made.
Where the Gates help
Idea definition makes the proposed capability and its assumptions explicit.
State of the art examines what existing research supports, under which conditions, and what remains unresolved.
Feasibility examines whether the intended capability has a credible basis within the project’s constraints.
Research decomposition turns consequential unknowns into defined investigations.
The resulting knowledge can inform requirements and architecture. It may also require an earlier assumption or scope decision to be reconsidered.
These are relevant points of examination, not a claim that the example has passed those Gates.
What RDEP contributes
The value is not simply that someone asked for another test. The original proposal, its assumptions, the investigation, the finding and the next authorized step remain connected.
A persuasive answer becomes something to investigate. What the investigation reveals can change what the project should attempt, how it should proceed—or whether it should proceed at all.
Explore the full Gate path ↗Read this worked example as a standalone page ↗
Read the real case: correcting a mistaken source attribution during RDEP’s development ↗
Download the documented source-attribution case (PDF) ↗
The linked case and PDF concern a real memory-source attribution error. They are separate from the fictional acoustic scenario above.
Engineering Transition Gate
Entry into implementation has its own conditions: sufficiently defined requirements, interfaces and architecture, recorded assumptions, risk mitigation and planned verification. If an unanswered research question could make the design unsuitable—for example, if a necessary capability has not been shown to work—the project needs further investigation before committing to that design. Open questions can remain only where they do not undermine the basis for entering implementation.
Implementation under continued governance
Projects can activate RDEP’s implementation profile after passing the Engineering Transition Gate. Its activation is recorded in the project.
Bounded work
Define the scope, authority, requirements and decisions for each work package.
Acceptance evidence
Verify the work against relevant tests, measurements and acceptance criteria.
Controlled changes
Keep authoritative records aligned with the work and preserve material failures.
Coordinated execution
Make ownership, shared interfaces and review authority clear across executors.
New evidence still matters.
Assumptions, open questions and decisions remain traceable. Existing records capture invalidated assumptions, affected decisions and conditions for reconsideration. When implementation reveals new evidence, the team examines which assumptions, requirements and decisions it affects and prepares the corresponding review. The accountable human then decides what needs revision, what further work is authorized and whether a relevant Gate decision needs reconsideration. That decision and its scope are recorded before dependent work proceeds.
Comprehensibility is a condition for informed decisions and a prerequisite for authority
As a project expands, more specialties become involved and terminology and abbreviations accumulate, the accountable human may no longer be able to clearly assess the basis of proposals or the consequences of decisions.
RDEP addresses this through a set of connected mechanisms: clarifying the problem and scope, breaking down complex questions, distinguishing evidence from assumptions, preserving the origin of information, examining alternatives and their consequences, recording unknowns, and allowing questions and reconsideration before commitment.
Clear language and explained terminology support this process. The aim is for the human to understand what decision they are making, on what basis, within what limitations and with acceptance of which risks.
Language quality matters alongside these mechanisms. In developing RDEP, selected parts of ASD-STE100 have been examined, including approaches to clear statements, consistent terminology and identifying who is responsible for each action. Some bounded rules arising from this examination have been incorporated into the Engineering Method and the documents it governs.
Because ASD-STE100 was developed for English, extending this approach to multilingual communication requires adapting expression to each language. This direction has been pursued within RDEP, and drafts have been prepared. It does not amount to full adoption of the standard or implementation of a comprehensive language control across all conversations.
The aim is to support informed human understanding: clear language must work alongside traceable evidence, an explanation of the reasoning, explicit unknowns and examination of the consequences of decisions.
A lantern in the dark
For people working with AI agents, a particular challenge arises when a project reaches beyond the knowledge available to the people involved. This can happen in two ways.
Breadth: Work spans several fields, but the person or team directing the agents does not have sufficient knowledge in every field to assess the answers unaided.
Depth: The project enters unfamiliar territory. Even knowledgeable participants may not initially recognize which questions, constraints or dependencies they need to investigate.
RDEP was designed to address this situation. When a human turns to AI agents to investigate questions beyond their own knowledge and understanding, another important question arises: how can they tell whether the agents' answers, analyses and proposals have an adequate basis?
When an AI answer goes beyond our knowledge, being persuasive is not enough to make it trustworthy. RDEP helps us examine where the answer came from, what it assumes, what remains unknown, and what investigation or testing is needed before we can rely on it. In this way, an agent's answer is questioned and examined before it determines the project's direction.
These mechanisms help expose deviations and support reconsideration of the path—especially where a human cannot assess an agent's answers through personal knowledge alone. RDEP organizes collaboration with agents within a framework of research, scrutiny and accountable decision-making.
These mechanisms support two kinds of review.
First, questioning a proposal can reveal a mistaken premise before a decision is made. An advisor or executor may expose an ambiguity, inconsistency or consequence that helps the human reassess the proposal.
Second, preserved records can help examine an error discovered later. When the relevant sources, assumptions and decisions have been retained, they can help identify what needs to be reconsidered.
To preserve the validity of project knowledge and decisions, RDEP distinguishes what we know, what we have assumed and what we do not yet know. The basis of each conclusion must remain open to examination so that, if new evidence calls it into question, we can identify which interpretations and decisions need to be reconsidered.
RDEP requires the basis of important conclusions and decisions to remain traceable and open to examination.
Three things RDEP is not—and does not seek to be
It is not document production. Complete documentation, a clean repository and passing automated tests do not establish scientific or engineering maturity. Producing an artifact never, by itself, means passing the stage for which that artifact was created.
It is not a tool. Tools, scripts and agents can enforce policy, but they do not define it. The moment a tool becomes a second source of truth, the very problem RDEP was created to address has returned.
It is not a replacement for the human. Reserved decisions and risk acceptance remain with the accountable human; assigning work to an agent does not transfer that authority.
The basis for research and decision-making in RDEP
RDEP provides a framework for collaboration between humans and AI agents in research and engineering: the necessary questions, required evidence, assumptions and unknowns must be clear, and each participant's decision-making responsibilities and authority boundaries must be specified.
Facts, observations, measurements, inferences, assumptions, hypotheses, proposals and decisions are not interchangeable. Repeating a statement, presenting it confidently, recording it in a document or obtaining agreement from several agents does not prove it.
The aim is to reduce uncertainties that could change the project's direction before making decisions that are difficult to reverse. Progress means gaining a better understanding and being able to examine its basis. More text, diagrams or code do not, on their own, demonstrate such progress.
RDEP's rules do not depend on a particular model, vendor or application's proprietary memory. When a tool or agent changes, the basis of evidence and decisions must remain accessible, understandable and open to examination by the accountable human, enabling them to direct the project with informed judgment. RDEP's Core covers research and engineering definition through authorized entry into implementation; subsequent execution can be organized through appropriate controls that remain subordinate to the same principles.